While in mechatronics and electrics the lead times are reduced with modern engineering methods, the softare is tested often only on the finished and electrical completely connected machine - which at faults can lead to additional, unexpected costs.

The keyword here is "virtual commissioning" and brings the following benefits:

  • Time gain throug parallelization of mechanical engineering and control engineering
  • Early identification of faults or necessary adjustments through in advance simulation of the machine (not on the building site itself)
  • Saving of staff costs for commissioning.